Annual Production
 value
435 MWh
CO2 avoided
 value
205ton
Total Power
 value
300 kWp
Trees planted
 value
5200
Annual energy consumption
 value
87

With 7600 m2 of manufacturing area, Tridec decided to take advantage of this surface to integrate a photovoltaic power plant with the prior renovation of the roof. It was a project in which Helexia invested around 400k€ for a 15-year contract.

Tridec committed to energy production and optimization

With Helexia we developed a project for the installation of a photovoltaic plant with roof renovation. It also included an energy management system to monitor consumption and improve energy efficiency.

The power plant installed was 300 kWp, with an estimated annual production of 435 MWh which corresponds to 205ton/year of avoided CO2. This is equivalent to the CO2 absorbed by 5200 trees or the corresponding to the annual energy consumption of 87 families.

This German company, the world market leader in steering systems, is making great strides on its way to decarbonizing its processes.

From needs analysis to implementation, we believe that a decarbonized economy is the path to growth.